Educerie

Educerie · AP · Environmental Science

AP Environmental Science 5.13

Methods to Reduce Urban Runoff

How do people use land and water, what does that use do to natural systems, and how can it be made sustainable?

What you will learn

  • Understand that every method works by raising infiltration or cutting paved area
  • Know how permeable pavement, trees, public transport and building up reduce runoff
  • Know a benefit and a drawback of each method
  • Understand how to design a test of runoff from two surfaces

You must be able to

  1. Name the methods that reduce urban runoff
  2. Explain how each method reduces runoff
  3. Read a hydrograph before and after paving
  4. Identify the variables, control and measure in a runoff test
  5. Write a testable hypothesis
  6. Propose a method and justify it

In the exam. Section I multiple choice: a hydrograph or table from a test of paving types, an experiment comparing runoff from different surfaces, or a scenario in which a city wants to cut flooding. In Section II, runoff is a natural setting for a design-an-investigation question (variables, a control, how a change in the method changes results) and for a solutions part. The suggested skill is Practice 4: identify a research method, design or measure used.

1The problem they solve

On natural land, rain soaks into the soil (infiltration), is caught by leaves or is taken up by plants. On impervious surfaces it runs off. Figure 1 shows the effect on a stream: the same storm gives a higher, earlier peak flow after the catchment is paved.

Figure 1. Stream flow after the same storm, before and after the catchment is paved. After paving the flow rises sooner, reaches a peak more than two and a half times as high, and falls back sooner. Invented numbers 2 4 6 8 10 20 40 60 80 100 0 stream flow (m3 per s) hours after the rain starts 30 3 before: fields after: paved
Figure 1 · Stream flow after the same storm, before and after the catchment is paved. After paving the flow rises sooner, reaches a peak more than two and a half times as high, and falls back sooner. Invented numbers

Read Figure 1 in this order:

  • The horizontal axis is time after the rain starts. The vertical axis is how much water passes in the stream each second.
  • The teal curve (before, with fields) rises slowly and peaks at 30 m³ per second after 6 hours.
  • The amber curve (after paving) rises fast and peaks at 80 m³ per second after 3 hours.
  • So paving made the peak about 2.7 times as high (80 / 30) and 3 hours sooner.
  • A higher, earlier peak means a greater chance that the stream overflows its banks.

The methods below aim to move the amber curve back toward the teal one.

2The four methods

1. Permeable pavement.

  • What it is: paving made so that water can pass through it, or through gaps in it, to the soil below. It replaces traditional pavement.
  • How it helps: rain soaks through instead of running off, so infiltration rises and runoff falls. Groundwater is recharged.
  • Drawbacks: it can cost more than traditional pavement, and it needs upkeep so that gaps do not clog.

2. Planting trees.

  • How it helps: leaves and branches intercept some rain. Roots open paths for water to soak in, and trees take up water from the soil and release it to the air. So less water runs off.
  • Extra advantages: shade, habitat, and carbon stored in the trees (5.2).
  • Drawbacks: trees take time to grow, need space and upkeep, and roots can damage pavement.

3. Increased use of public transportation.

  • How it helps: if more people use buses and trains, fewer car parks and roads are needed, so less land is covered by impervious surface.
  • Extra advantages: fewer vehicle emissions, less traffic.
  • Drawbacks: it needs money to build and run, and it works best where enough people live along routes.

4. Building up, not out.

  • What it means: putting more people in taller buildings on less land, rather than spreading low buildings over a large area (this is the opposite of urban sprawl, 5.10).
  • How it helps: a smaller area is paved and roofed, so more land stays covered by soil and plants that let water in.
  • Extra advantages: less loss of farmland and habitat, and shorter trips.
  • Drawbacks: tall buildings can be costly to build, crowding can raise other problems, and the paved area under a tall building is still impervious.

3Choosing and justifying

When an exam asks you to propose a solution, name the action, who does it and the mechanism, and then add a second advantage.

Example (invented): "The city council requires permeable pavement for all new car parks. Rain soaks through to the ground, so less runs off and the nearby stream floods less. A second advantage is that the water that soaks in recharges the groundwater the city uses."

4Designing a test of a method (Practice 4)

This topic's suggested skill is identifying the method, design or measure of an investigation. A typical test compares surfaces.

Example (invented): a student wants to know whether permeable pavement reduces runoff. She lays a 1 m² slab of permeable pavement and a 1 m² slab of traditional pavement on the same slope. She pours 20 litres of water on each over one minute and collects the water that runs off the lower edge.

Part of the designIn this test
QuestionDoes permeable pavement reduce runoff compared with traditional pavement?
Independent variableThe type of pavement
Dependent variableThe volume of runoff collected (litres)
ControlThe traditional pavement slab, which is the comparison
ConstantsSlope, area, amount and rate of water, starting wetness
HypothesisIf permeable pavement is used, then the volume of runoff will be lower than from traditional pavement, because more water soaks through it

How a change to the method changes the results: if the student poured the water on the permeable slab faster than it can soak in, runoff would rise, because the water arrives faster than infiltration can take it. If she did only one trial, the result would be less reliable than the mean of several trials.

5Worked examples

Example 1 (invented): hydrograph.

After a car park is built, the stream's peak flow in a storm rises from 30 to 60 m³ per second. What is the percent increase?

  • Setup: (60 - 30) / 30 x 100
  • Answer: 100% increase.

Example 2 (invented): explain.

A council plants trees along a street. Explain how this reduces runoff.

  • Leaves and branches intercept some rain.
  • Roots help water soak into the soil, and trees take up water.
  • So more infiltration and less runoff reach the drains and the stream.

Example 3 (invented): drawback.

Give a drawback of building up, not out.

  • Taller buildings can cost more to build, and more people live on less land, which can raise crowding and demand on services.

Practice questions

30 questions on this note, from easy to hard. Each one you get right lights a star of this topic's constellation.