How can a business make what customers want with less waste and fewer defects, and what must it change inside itself to do so?

What you will learn

  • HL Know the features of lean production and how kaizen and just-in-time cut waste
  • HL Understand cradle to cradle design as a closed loop for materials
  • HL Understand quality control, quality assurance, quality circles, benchmarking, TQM and quality standards
  • HL Understand the gains and risks that lean production and TQM bring to an organization

You must be able to

  1. HL Evaluate whether a named business should introduce lean production and TQM
  2. HL Distinguish between quality control and quality assurance
  3. HL Explain one advantage and one disadvantage of just-in-time for a business in the case
  4. HL Analyse how kaizen, quality circles or TQM could cut faults and costs
  5. HL Explain why a national or international quality standard matters to a business
  6. HL Describe features of cradle to cradle design for a given product

1Lean production: less waste, greater efficiency (AO1)

Less waste. Waste is anything the business pays for that does not end up as value the customer wants. These forms help you spot it in a case:

Kind of wasteWhat it looks like
OverproductionMaking more than has been ordered, so goods wait unsold
Excess stockMaterials and finished goods sitting in storage, tying up money and floor space
WaitingPeople or machines idle until the next input or sign-off arrives
DefectsFaulty units that are scrapped, reworked or sent back
Needless movementPeople or parts travelling further than the task needs
Over-processingDoing more to a product than the customer values, such as a finish nobody sees
Unused ideasStaff who could suggest improvements but are never asked

Waste is not only physical: a form needing five signatures wastes time, as unsold goods waste material.

  • Right first time (zero defects) = the cheapest fault is the one never made.
    • A reworked unit is already paid for once.

Greater efficiency

  • Every hour, kilogram and dollar no longer lost to waste goes into output.
    • Efficiency is output measured against inputs.
  • It shows as shorter lead times, lower average cost per unit and less cash tied up in stock.
  • Lower unit cost gives a choice:
    • Keep the price and earn a wider margin on each unit.
    • Or cut the price, keep the margin and take sales from rivals.

Lean is a mindset for every process, not one technique. It has costs and limits (section 10): training, sometimes new software, dependence on suppliers and staff, and frustration if a process is squeezed too hard. The guide's two methods are kaizen and JIT.

2Continuous improvement (kaizen) (AO2)

  • Kaizen = continuous improvement.
    • The two Japanese words mean roughly "change for the better".
  • It rests on two beliefs.
    • A process can always be made a little better.
    • The people who work on it daily see best how.
  • What sets it apart: improvement comes through many small steps taken by many people, all the time.
    • It is not one large management reform, or a project that ends.

The cycle repeats:

  1. Involve the people doing the job; a small team often speaks for the wider workforce.
  2. Find the problems and list ideas for fixing them.
  3. Choose a fix, favouring cheap and quick ones.
  4. Test it on a small scale first.
  5. Check the result: did the measure actually improve? Keep what worked, drop what did not.
  6. Make the better way the standard, and start again with the next problem.
  • Teams often ask why again and again to reach the root cause.
  • Example: at Orrin Lamps (an invented firm) shades reach customers scratched.
    • Why? They rub in the box.
    • Why? The dividers are too short.
    • Why? They were cut from offcuts.
    • Why? Nobody owns the packing specification.
  • The cause is a missing owner, not careless packers.
    • The fix: name an owner and cut dividers to size.

Small steps add up. Orrin makes 240,000 shades a year at $11.20 each. Its teams aim to cut unit cost by 2 percent a year, through moves such as shorter walks to the packing bench and fewer rejected frames.

  • Year 1: $11.20 × 0.98 = $10.976, saving $0.224 a shade, or $53,760 a year.
  • Year 3: $11.20 × 0.98³, about $10.541, saving about $0.659 a shade, or $158,076 a year.

No step needed large spending, and the target moves each time it is met.

StrengthsLimits
Needs little capital; each step is cheapEach gain is small, so progress can feel slow
Uses what employees know, and a say in how they work can motivate themNeeds managers who listen and a culture without blame; if ideas are ignored, people stop offering them
Lowers cost and raises quality together, with no disruptive launchA crisis, or a rival with new technology, may call for a big change (innovation) that kaizen cannot supply
People resist a small tweak less than an upheavalEasy to start and then let fade

Kaizen links to motivation (2.4) and to quality, since most small improvements remove a cause of defects or waste.

3Just-in-time (JIT) (AO2)

  • Just-in-time (JIT) = ordering materials, and making goods, only when needed, so stock is close to zero.
    • Inputs reach the line as they are used. Finished goods go to customers, not a warehouse.
  • It attacks the waste of idle stock, which also hides problems.
    • Spare parts cover for a bad supplier; spare finished goods cover for a faulty line.
  • The saving in numbers. Ulverton Boats (an invented firm) assembles small motorboats. It used to keep about 420 outboard engines at $650 each: $273,000 of stock.
    • Holding stock costs 15 percent of its value a year, or $40,950.
  • A nearby supplier now delivers engines twice a week. Ulverton keeps about 60: $39,000 of stock and $5,850 a year of holding cost.
    • The yearly saving is $35,100.
    • 360 engines' worth of cash, $234,000, is released to fund other needs or pay debt.

What JIT demands:

  • Reliable suppliers who deliver the right quantity, on time and to the right quality.
    • A late or faulty delivery has no stock behind it.
  • A flexible, multi-skilled workforce who can move to where work is and cover absences.
    • Contracts must allow it: negotiation and training.
  • Accurate information, often software linking sales, orders and stock.
  • High-quality inputs and processes, because no spare stock exists to replace a defective part.
  • Flexible equipment that switches product quickly (suits small batches and mass customization, 5.2).
  • Trust between the business, its suppliers and its staff.
    • A dispute that stops supplies or work stops everything.

The risk is the other side of the saving.

  • Say the engine supplier is a day late. Then 30 assemblers on $22 an hour stand idle for an eight-hour shift.
    • That is 30 × 8 × $22 = $5,280 of wages for no output, plus late orders and unhappy buyers.
  • A strike or a van breakdown does the same.
    • A buffer of stock would absorb the delay (5.6 compares JIT with holding buffer stock, "just-in-case").

Effects of JIT.

  • Output swings with demand.
    • The line runs only when orders exist, so the factory is busy less evenly.
    • Quiet spells become maintenance time. Nothing is made that will sit unsold.
  • The business leans harder on suppliers and staff.
  • Quality tends to rise. With no cushion for faults, people aim to get each unit right first time.
  • Less is wasted. Little stock means less time, money and space wasted.
StrengthsLimits
Lower holding costs and less storage spaceLittle protection if supplies are late or poor
Cash released from stockCannot easily meet an unexpected surge in orders
Less waste from stock that is damaged or out of dateRelies on strong supplier relationships, which gives suppliers bargaining power
Faults show up at once and get fixedPossible loss of bulk-buying discounts; more frequent deliveries mean more transport costs and perhaps more emissions
  • JIT suits steady, forecastable demand, nearby reliable suppliers and perishable or fast-changing stock (fresh food, fashion, technology).
  • It suits less well where suppliers are distant or unreliable, demand swings sharply or restocking is slow.

4Cradle to cradle design and manufacturing (AO2)

  • Most manufacturing is a straight line: take materials, make, use, throw away ("cradle to grave").
    • Often there is planned obsolescence, where a product is designed to wear out or date so buyers must replace it.
  • Cradle to cradle (C2C) = design and manufacturing that tries to close the loop.
    • A product is designed so that, after use, its materials go back into new products or return safely to nature.
    • Nothing becomes waste: the waste of one cycle is the input of the next.
  • The course books differ on who coined the phrase.
    • One credits the Swiss architect Walter Stahel, in 1971.
    • Another says William McDonough and Michael Braungart first used it. They developed the approach in the 1990s and set it out in their 2002 book Cradle to Cradle.
  • It is one kind of circular business model (a toolkit tool): outputs return as inputs, reducing waste and raising resource efficiency.

Features to know:

  • Materials are chosen to be reusable or safe to return to nature, avoiding toxic mixtures that cannot be separated.
  • Products are designed to be taken apart, so parts can be recovered, repaired or reused.
  • Two separate loops.
    • Materials that break down safely (natural fibres, some packaging) return to the soil as biological nutrients.
    • Metals and many plastics stay in a technical loop, remade into products of equal quality, not downgraded.
  • The making itself is cleaner too. Makers are pushed to use less water and energy and cut the pollution their plants release, not only redesign the product.
  • The business may keep ownership of the product, or take it back (leasing, return schemes) so that it gets the materials back.
  • Waste is treated as a resource, not a cost to minimise.
  • Example. Wrenfield Displays (an invented firm) leases shop display stands to retailers. Each has a screwed (not glued) steel frame and hemp-board shelves bound with starch, so the parts separate.
    • At lease end Wrenfield collects the stand. The frame is remelted into new frames (technical loop) and the hemp board composted (biological loop).
    • It buys less new steel and pays no landfill fees. Retailers get a display service, not fittings to dispose of.
StrengthsLimits
Less demand for new raw materials and less wasteRedesign, tooling and collection systems cost money first
Appeals to customers and staff who care about the environment; supports social responsibilityNot every product can be fully recovered (mixed materials, electronics, goods used in dirty places)
Shields the firm from rising raw-material prices and waste rulesNeeds a returns system and customers who take part
A source of creativity in design and the business modelA rival that ignores end-of-life costs may undercut it, at least for a while
  • Lean and C2C share a goal, less waste.
    • Lean looks at waste inside the process; C2C at waste across the product's whole life.

5Quality: what it means and why it matters (AO2 background)

  • Quality = how well a product or service meets its specification and what customers expect of it.
  • It is judged from the customer's side, not by price.
    • A basic bicycle lock is high quality if it reliably does what it promises. A costly one is poor quality if it jams.
  • For operations, the test is whether it does the job it is meant to do: is it fit for purpose?
  • Poor quality is costly: scrap and rework, returns and replacements, staff time on complaints, lost repeat custom and, at worst, recalls or legal claims.
    • The quality writer Philip Crosby estimated that putting right the consequences of poor quality can take 20 to 35 percent of a firm's revenue.
    • He argued that preventing mistakes costs far less than correcting them.
  • Businesses also sample output and use descriptive statistics (toolkit) to judge whether its variation from the specification matters.

6Quality control and quality assurance (AO2)

Quality control (QC)Quality assurance (QA)
IdeaCheck output against the standard and remove faulty unitsPrevent faults by building quality into the whole process
WhenAfter or during production, at set checkpointsBefore and throughout: design, suppliers, training, procedures
MethodInspection, sampling and testing of finished units or batchesDocumented procedures, supplier approval, staff training, self-checking, audits
WhoUsually inspectors or a quality departmentEveryone involved in the process
Cost patternFaults found late, after material and labour are spentSpending goes in early; fewer faulty units later
Attitude to defectsTreats them as unavoidable and tries to catch themTreats them as avoidable and tries to design them out

Control is the older of the two, and it costs twice:

  • Material and labour are already spent on each faulty unit found at the end.
  • Care may drop.
    • A line that knows an inspector will catch mistakes may stop taking care, since errors seem to be someone else's problem.

Inspection protects the customer but leaves the cause in place.

Assurance aims at prevention, through:

  • Self-checking. Each employee inspects what they have done before handing it on, rather than waiting for an inspector.
  • The right to reject.
    • Anyone handed faulty work by a colleague can send it back.
    • Faults stop where they start, not at the end of the line.
  • Choosing the right suppliers.
    • A supplier approved for quality delivers inputs the business can use without inspecting.
    • If a batch is faulty, the blame sits with the supplier, which gives it every reason to get things right.
  • Training, so people can do the job correctly every time.
  • Written procedures that define how the task is done.
  • Worked comparison. Quillan Zips (an invented firm) makes 400,000 zip sets a year, each costing $3.10 in materials and labour. With end-of-line inspection, it scrapped 6 percent: 24,000 sets, or $74,400.
  • It then:
    • approved its metal-strip suppliers
    • trained machine crews to check the first and tenth set of every batch
    • wrote step-by-step set-up sheets
  • Scrap fell to 2 percent: 8,000 sets, $24,800.
    • The saving is $49,600 a year against a first-year programme cost of $45,000. That is a gain of $4,600 in year 1 and $49,600 a year afterwards.
  • The end-of-line check still runs (control).
    • The new work before and during production is assurance.
  • Control alone pays for faulty units and still risks one reaching a customer. Assurance alone has no check that the process works.
    • So most businesses use both, shifting weight to prevention.

7Quality circles and benchmarking (AO2)

  • Quality circle = a small group of employees (about four to ten) who meet regularly.
    • They find quality problems, work out their causes and propose solutions for management.
  • Most often the members work in one area, and its scope is that patch.
    • The finishing shop's circle fixes finishing problems, not company-wide ones. A large business may run a circle in each area.
  • The books also describe circles from several departments or all levels, sometimes with a manager in the chair or specialists invited in.
    • Either version earns the mark if it is a small group of staff solving quality problems.
  • Membership is usually voluntary.
    • Circles thrive only where staff believe their ideas will be used and managers answer quickly.
  • Gains: the business gets the knowledge of those who do the job.
    • Staff gain a voice, which can motivate (2.4). Many ideas cost little.
  • Limits: meetings take time from output.
    • If managers ignore the proposals, interest dies. Ideas are usually modest in scale, so they cannot replace larger investment.

Benchmarking = measuring performance in one area against the best performer, then using the gap to set targets and learn how to close it. The comparison can be with:

  • Another part of the same business (internal): one branch or line against another.
  • A direct competitor (competitor benchmarking): useful, but data is hard to get.
  • A leader in any industry at the same task (best practice or functional benchmarking).
    • For example, a hospital studies how a supermarket chain restocks shelves overnight.
    • A firm that is not a rival is more willing to share.

What gets measured is whatever customers notice: time to fill an order, share of deliveries on time, billing errors, breakdowns, complaints.

The stages:

  1. Decide what to compare, with whom, and who leads.
  2. Collect the partner's figures, often by visiting.
  3. Find the gap and its causes.
  4. Rework the borrowed method to fit your own firm.
  5. Measure again to see if the gap closed.
  • Example. Marsett Dental Lab (an invented firm) takes 12 days to supply a crown after a dentist's order.
    • Its owner learns that the best regional rival manages 6 days. She also learns that a print shop outside dentistry moves each job through colour-coded trays so nothing waits unseen.
    • She sets a target of 8 days and adopts the tray idea, adapted to crowns. Without the comparison she might have thought 12 days was normal.
  • Benefits: a clearer view of what customers and rivals do, fewer complaints, less waste, a habit of learning.
  • Limits: rivals may keep methods secret (one reason to look outside the industry).
    • A method that works elsewhere may not suit your staff, equipment or customers.
    • The study costs time and money. Only matching others gives no lead over them.

8Total quality management (TQM) (AO2)

  • Total quality management (TQM) = a philosophy in which every employee in every department is responsible for quality, not only inspectors.
    • The aim is to meet customer needs and prevent errors altogether.
  • It extends quality assurance to the whole organization: a billing mistake or missed delivery slot harms quality as much as a faulty part.

Its features:

  • A customer focus that includes internal customers. Anyone who receives your work is your customer.

Example: at Hollinbrook Bakery (an invented firm) the storekeeper's internal customers are the mixers. They need the right flour in the right bay at the start of each shift. The mixers' customers are the bakers, and so on to the shopper.

  • Quality built in, not inspected in: the goal is right first time, or zero defects.
  • Everyone is involved, trained and given the authority to stop a fault at its source.
  • Continuous improvement (kaizen) is part of it, and quality circles and benchmarking are common tools.
  • Management commitment with time and money, because a TQM drive that managers abandon fades.

TQM changes culture, so it takes years to establish, and employees may resist it:

  • Sending back a friend's faulty work is awkward.
  • Extra duties and courses feel like a burden.
  • Staff who relied on inspectors may not see why checking is now their job.
  • They may fear that success will make the inspectors redundant.

Each worry has an answer: show the case for change, train and support people until they feel able, and reward the added responsibility fairly.

StrengthsLimits
Fewer defects, less rework and fewer returns, so lower costsTraining and set-up cost money and time before the benefits show
Better reputation and loyalty; may allow a higher priceNeeds staff buy-in; people who feel blamed or overloaded resist
Employees take ownership, which can raise motivationBenefits are hard to measure, and results come slowly
Faults are found at the source, not by customersFades if management loses interest; may become box-ticking

9The importance of national and international quality standards (AO2)

Quality standard = published requirements for a product, process or management system, against which a business can be checked and certified.

  • National standards are set by a country's standards body or government and apply within it (for example, safety rules for electrical goods or building materials).
  • International standards are agreed between many countries.
    • The best known is ISO 9001, which describes a quality management system.

The International Organization for Standardization (ISO) writes the standards. Independent auditors check the business against them and award the certificate.

To be certified to ISO 9001, a business must show that

  • senior managers back its quality system,
  • the system centres on what customers require, and
  • it keeps improving.

Why they matter:

  • They give customers trust.
    • A certificate tells a buyer who cannot inspect every item that the maker follows a recognised system.
    • This matters most to business customers choosing suppliers.
  • They open markets.
    • Some customers and governments only buy from certified firms.
    • An international standard is understood across borders (4.6).
  • They differentiate the business from rivals without certification and give marketing a credible message.
  • They force the business to be organised.
    • To pass, it must write down its processes and review them, which supports QA and TQM.
    • It also gives staff a clear target that can motivate them.
  • They protect consumers and the business against safety failures and legal action. Failing a national safety standard may be illegal.

Limits for the business:

  • Certification costs fees, time and effort.
  • It shows the system exists, not that every unit is perfect.
  • A small business may find the paperwork heavy.
  • Standards change, so they must be kept up.

10The impact of lean production and TQM on an organization (AO3)

This is the AO3 statement, so expect an extended answer. Pick the effects that matter for this business and weigh them.

AreaLikely impact
CostsLower: less stock held, less scrap, less rework, less wasted space; but training, new systems and supplier premiums come first
QualityHigher: defects are prevented and found early; fewer returns
Productivity and efficiencyHigher, as waste is cut and time between steps falls
EmployeesMore involvement, wider skills and responsibility, which can motivate; also more pressure, retraining and flexible hours. With no stock to fall back on, an absence or strike halts the line, which hands staff bargaining power
SuppliersCloser and more demanding relationship; the business depends on them and they gain power
Flexibility and imageFaster response to orders but less cushion for a surge; better name for reliability; less waste supports sustainability
FinanceCash released from stock; lower costs lift profit, but the cost of change is paid up front

What decides whether the impact is good?

  • How reliable are suppliers and staff? JIT rewards trust and punishes weakness.
  • How stable is demand? Steady demand makes lean easy; wild swings make it risky.
  • Is the culture ready? TQM and kaizen need staff who are listened to. Where managers blame, they fail.
  • How big is the up-front cost against the saving? Compare the yearly saving with the cost of change, and the time to pay back.
  • How long can the business wait? TQM and a lean culture take years to pay off fully.
  • What would the alternative be? A leaner rival may undercut prices.

A strong conclusion is a conditional decision.

"Adopt lean in stages: begin with kaizen and quality circles, which cost little and test the culture, and add JIT only for items with reliable local suppliers."

A weak one lists advantages and stops.

Practice questions

28 questions on this note, from easy to hard. Each one you get right lights a star of this topic's constellation.