Investment appraisal
A business can spend its money on an asset or a project; will the money come back, how fast, and is it worth more than the alternatives?
What you will learn
- Know how to work out the payback period and what it says about how quickly a project's cost is recovered.
- Know how to work out the average rate of return and compare it with a target or the cost of borrowing.
- HL Understand the time value of money and how net present value uses a discount table to allow for it.
- Understand why the methods can disagree and why risk, finance and the business's aims matter in the final choice.
You must be able to
- Calculate the payback period in years and months from a table of net cash flows.
- Calculate the average rate of return using the formula given in the exam.
- HL Calculate net present value from given discount factors.
- Comment on why payback and ARR favour different projects.
- Explain a strength or limitation of each method, linked to the business.
- Recommend which project a business should choose, using figures and non-numerical factors.
In the exam. the guide puts 3.8 in the content for both levels at AO3 and AO4: calculating (AO4) and judging (AO3). Payback and ARR can therefore appear on Paper 1 (an unseen case, mostly qualitative, though the guide allows minor calculations) and on Paper 2, which has a quantitative focus. On both papers Section A is assessed at AO1, AO2 and AO4 only, so "calculate" and "comment on" belong there; AO3 is assessed in Section B, so "evaluate", "recommend" or "justify" an investment belongs in the extended responses. NPV is HL only: never on Paper 1 and never on SL Paper 2. It can appear on HL Paper 2, and an HL Paper 3 recommendation could draw on it. The formulae sheet prints ARR (SL/HL) and NPV (in its HL-only part) but not payback, and the guide says a discount table is provided in the paper when a question needs one. Past papers ask for a calculation far more often than for anything else on this topic, so the arithmetic below is worth drilling until it is automatic.
1What every method needs
All three work from the same three facts. An exam gives them to you:
- The capital cost (the original cost): money spent at the start.
- The net cash flow the project is expected to produce in each year: the cash it brings in minus the cash it costs to run.
- The life of the project in years (also called the years of use).
Two conventions to keep straight:
- The cost sits at the start (year 0). The returns arrive at the end of each year.
- The figures are cash flows, not profit. Depreciation is not a payment (3.4, 3.7), so it is not subtracted from a year's net cash flow.
One running example runs through sections 2 to 7.
Marrow Hill Cidery (invented) presses and bottles apple cider for farm shops. It is considering a $90k bottling line expected to last five years, with these net cash flows ($000):
| Year | 0 | 1 | 2 | 3 | 4 | 5 |
|---|---|---|---|---|---|---|
| Net cash flow | (90) | 18 | 24 | 30 | 36 | 27 |
Brackets mean money going out. Year 0 is now.
2Payback period
Payback period = the time a project takes to earn back its capital cost.
The formulae sheet prints no formula for it, so learn the steps.
- Build a cumulative cash flow row: add each year's net cash flow to the total so far.
- Find the year in which the total first reaches the capital cost.
- For the part-year, divide the amount still needed at the start of that year by that year's net cash flow. Multiply by 12 for months.
| Year | 1 | 2 | 3 | 4 | 5 |
|---|---|---|---|---|---|
| Net cash flow | 18 | 24 | 30 | 36 | 27 |
| Cumulative | 18 | 42 | 72 | 108 | 135 |
- The cost of 90 is passed during year 4. After three years, 72 is recovered and 18 remains. Year 4 brings 36.
- This assumes cash arrives evenly through the year. Say so in an answer.
- Or turn year 4 into a monthly figure (36 ÷ 12 = 3 per month). 18 takes 6 months. Same answer.
Three special cases.
- Even cash flows. If the net cash flow is the same every year, payback is cost ÷ annual cash flow. A $36k drone bringing in $9k a year pays back in 4.0 years.
- Exactly at a year end. If the cumulative total equals the cost at the end of a year, there is no fraction. A cost of 60 with cumulative cash of 30, 55, 60 pays back in exactly 3 years.
- Never. If the cumulative total stays below the cost for the whole life, say the project does not pay back. A $80k project with cash flows of 20, 20 and 15 over three years returns only 55.
Common slips:
- Forgetting to add the full years to the fraction (answering "0.5 years").
- Treating 0.5 as 5 months.
- Dividing by the wrong year's cash. Use the payback year's cash, not the one before.
Decision rule
- A shorter payback is better.
- Many firms set a maximum acceptable payback, a limit the business chooses, which depends on its industry. A project beyond it is rejected, or needs another reason to go ahead.
Strengths:
- Simple and quick, with no percentages or tables. A small business with no finance specialist can use it.
- Shows how long cash is at risk. The forecast is least reliable far ahead. A short payback leans less on distant, shaky figures.
- Suits a cash-tight business or a fast-changing market. There, money must come back fast or the technology may be obsolete.
Limitations:
- Ignores everything after payback. Two projects cost 60 each. A earns 20 a year for five years. B earns 10, 20, 30, 50 and 70. Both pay back in exactly 3 years, so payback cannot separate them. Yet B returns 180 in total against A's 100.
- Ignores the timing of cash inside the payback period (a dollar in year 1 counts the same as a dollar in year 3) and the time value of money.
- Says nothing about profitability or return. It shows how soon the project is repaid, not whether it is worth doing.
- A cut-off is arbitrary. Why three years and not four?
3Average rate of return (ARR)
Average rate of return = the project's average yearly gain as a percentage of its capital cost.
The formulae sheet prints it:
Total returns = all the net cash the project brings in over its life.
- Take away the capital cost to get the total gain.
- Spread it over the years to get the average annual gain.
- Divide by the capital cost.
- So Marrow Hill's bottling line is expected to return, on average, 10 cents a year for each dollar spent, after getting its cost back.
- A frequent error is forgetting to subtract the capital cost. Using 135 ÷ 5 = 27 gives a meaningless 30%.
Decision rule. Compare ARR with two things:
- A target return the business sets (higher for a riskier project).
- other uses of the money: the interest rate on a loan to fund the project, or on savings.
- If Marrow Hill borrows at 6% a year, 10% leaves some room. The comparison is rough. A project carries risk and a bank deposit does not, so it should clear the bar easily. Of several projects, the highest ARR is preferred.
Strengths:
- Uses all the years, so it measures profitability, which payback does not.
- A percentage, so it compares projects of different sizes, and compares with an interest rate or a target.
- Easy to calculate from the same table.
Limitations:
- Ignores timing. Two projects can have the same ARR with cash arriving early in one and late in the other. Section 4 shows this.
- Ignores the time value of money, so it overstates distant returns.
- It is an average: it hides whether the project's returns rise, fall or swing.
- It depends on forecasts for every year, including the last ones, which are the least reliable.
- The percentage ignores the size of the gain: 40% on $2k is less useful than 12% on $200k.
4Why the methods can disagree
Corvane Veterinary Clinic (invented) has $60k to spend, which it would borrow at 6% a year. It has two choices, each lasting five years ($000):
| Year | 1 | 2 | 3 | 4 | 5 | Total |
|---|---|---|---|---|---|---|
| P: ultrasound unit | 30 | 25 | 5 | 5 | 5 | 70 |
| Q: boarding kennel block | 5 | 10 | 20 | 30 | 40 | 105 |
Payback prefers P (3 years against 3 years 10 months). ARR prefers Q (15% against 3.3%). Neither is wrong. They answer different questions.
- Payback rewards speed. It ignores that P's cash almost dries up after year 2.
- ARR rewards the total. It ignores that Q's money comes late.
- Which to trust depends on the business. A clinic that must repay a short-term loan, or fears a rival nearby, leans to P. One that can wait leans to Q.
- P's ARR of 3.3% is also below the 6% borrowing cost. Speed alone is not enough.
- ARR's timing weakness shows if P is turned round. A project Z has the same total of 70, arriving 5, 5, 5, 25 and 30. It has the same ARR of 3.3% as P, yet its cash comes two years later.
- Z's payback is 4 years 8 months against 3 years: cumulative 5, 10, 15, 40, so 4 + 20 ÷ 30. ARR cannot tell them apart. That is the gap NPV fills.
5HLNet present value (NPV)
This section is HL only. It does not appear on Paper 1, or on SL papers.
Time value of money = $100 today is worth more than $100 in three years.
- Today's $100 can be spent, or invested to earn a return. The future $100 might not arrive at all.
- Net present value converts every future cash flow into its value today, adds them up and subtracts the cost. It uses a discount rate, which reflects the interest the business could earn or pay elsewhere, plus a margin for risk.
The sheet's formula:
- The discount factor is read from the discount table, which the paper provides. The table gives factors for years 1 to 10 at discount rates of 4%, 6%, 8%, 10% and 20%.
- Each factor is 1 ÷ (1 + rate)^years, so year 3 at 10% is 1 ÷ 1.1³ = 0.7513. You never work them out in the exam. Find the row for the year and the column for the rate.
- The cost is not discounted, because it is spent now (year 0). The factors fall as years pass or the rate rises. That is the idea.
Marrow Hill at 10% ($000):
| Year | Net cash flow | Discount factor (10%) | Present value |
|---|---|---|---|
| 1 | 18 | 0.9091 | 16.4 |
| 2 | 24 | 0.8264 | 19.8 |
| 3 | 30 | 0.7513 | 22.5 |
| 4 | 36 | 0.6830 | 24.6 |
| 5 | 27 | 0.6209 | 16.8 |
| Total present value | 100.1 |
Interpretation.
- A positive NPV means the project is expected to add value, after allowing for the time value of money at that rate. It can go ahead.
- A negative NPV means it earns less than the rate demands.
- Between projects, the higher NPV is better.
- $10.1k is the extra value Marrow Hill expects, in today's money, over the 10% return.
The rate matters. Same bottling line, same cash flows, different rates:
| Discount rate | 4% | 6% | 8% | 10% | 20% |
|---|---|---|---|---|---|
| NPV ($000) | 29.1 | 22.2 | 15.9 | 10.1 | (12.8) |
- The project passes at every rate in the table except 20%, where it falls well below zero. So the recommendation holds unless the business demands a very high return.
- The rate is a judgement. A bigger rate puts more weight on the near future.
Back to Corvane, at 10%:
- P has NPV ($1.8k): present values 27.27, 20.66, 3.76, 3.42, 3.10, total 58.21, less 60.
- Q has NPV $13.2k: 4.55, 8.26, 15.03, 20.49, 24.84, total 73.17, less 60.
- Z's NPV is ($11.9k).
- NPV separates P from Z, where ARR could not. It sides with Q over P, as ARR did, because Q's extra cash in years 4 and 5 survives discounting.
Strengths:
- Allows for the time value of money, so earlier cash counts for more and timing differences show up.
- Uses all the years' cash, and gives a result in dollars. It shows the size of the gain, not only a percentage.
- A clear rule: accept if the NPV is positive.
Limitations:
- The discount rate is a judgement. A small change swings the answer. A rate that flatters the project is easy to pick (a fair question for the ethics theme).
- Harder to calculate and explain than payback. Owners may not trust a result they cannot follow.
- Relies on forecasts for every year of the project. Discounting gives distant years less weight, but cannot fix a wrong forecast. The later years are the least reliable.
- It gives a dollar figure, not a rate, so comparing projects of very different sizes needs care.
- It says nothing about non-financial matters.
6Beyond the numbers: qualitative factors
The guide's 3.8 statement lists the three calculations. But it marks the topic AO3. An AO3 verb ("recommend", "evaluate") asks for a judgement, and a figure alone is a thin one.
Raise the factors that bite on the case:
- Risk and the reliability of the forecast. Who produced the numbers, and how sure are they? Test them: if every year's cash is 20% lower, do the methods still pass? For Marrow Hill the cash flows become 14.4, 19.2, 24.0, 28.8 and 21.6.
- Payback stretches to 4 years 2 months.
- ARR drops to 4% (below the 6% loan).
- (HL) NPV at 10% turns negative, ($9.9k).
A project that looked comfortable fails on a modest miss, which tells the owners it has little margin.
- Finance. Can the business afford the cost, and from where? Borrowing adds interest and repayments (3.2). A cash-tight firm may value payback above everything.
- Fit with objectives and strategy. Does it support the business's goals (1.3), such as growth or entering a market? Or is it a distraction?
- Stakeholders, ethics and sustainability. Job losses from automation, noise for neighbours, environmental footprint, supplier pressure. A positive NPV does not make a project right.
- Capacity and disruption. Staff skills, downtime during installation, and whether the business can run two things at once.
- Opportunity cost. The money can go to only one project. The next best use of it is the true cost of choosing.
- Reversibility. Can the asset be sold or the commitment ended if it goes badly? A long lease is hard to leave.
- Flexibility and creativity. A project with a modest return may open options the figures do not capture, such as a new customer group. Creativity can also work against honesty: forecasts nudged upward to win approval make the methods look better than the project is.
- Not every factor matters in every case. Pick the two or three that fit the business in front of you. Use them to choose between options, not to decorate a list.
7Putting it together: a recommendation
A good "recommend" answer has this shape: figures for each option, what they mean, the risk, a decision, and what could change it. On Corvane, with P and Q:
Payback favours P (3 years against 3 years 10 months) and ARR favours Q (15% against 3.3%). For HL, NPV at 10% also favours Q ($13.2k against a loss of $1.8k).
P's cash is front-loaded, then falls to $5k a year, so its return is thin. 3.3% is below the 6% Corvane would pay to borrow.
Q's ARR is 2.5 times the borrowing rate. But it depends on year 5's $40k, a forecast that is hard to be sure of. If that year were $25k, payback would stay at 3 years 10 months. ARR would fall to 10% (computed as 90 − 60 ÷ 5 ÷ 60), still above the loan rate.
Recommended: Q. Its return clears the cost of borrowing even on the cautious figure, and P's does not.
This holds if Corvane can wait almost four years for the cost to come back, and has staff able to run a kennel block. If it cannot, P's earlier cash would win.
Look at what it does.
- It uses the numbers.
- It compares with the borrowing cost.
- It tests one weak assumption.
- It ties the decision to the business.
- It states what would reverse it.
Practice questions
28 questions on this note, from easy to hard. Each one you get right lights a star of this topic's constellation.